 Spent some time looking for the electrical and sewer main lines........unsuccessfully so far but I spoke with the former owner and have some clarity :-)  Nice hole though, good job Scott!
 Commercial projects require electrical in conduits, but not residential?  But we spent 1 1/2 days pulling out the old electrical and conduit.   Fun Fun :-)
 New electrical rough-in under way!
Recycling windows for the new garage, plus the side door. Garage is extra wide, about 28' thus the 2 1/2 bays.

Thursday, October 7, 2010

Remodeling the Shop & Carport

 Permits took awhile but we are finally off the ground and running.  Starting with the work out back.  The shop will become a 1000 sf M.I.L. apartment whilst the carport gets enclosed and becomes a 2 1/2 car garage.


Side of the Garage/Apt.   Ramp is where the entry will be.

Double Garage door on the front with a side bay ocer 8 ft wide.  Think shop/storage
Standing in the entry.  Dining is to the left & ahead is the Kitchen with counter bar 1/2 wall.  1 bedroom is straight back

Looking to the right is the Living room.  Opening gets filled in and we are reusing the windows on the ground in the new garage.

Existing House

 Main House w/drive at right

Carport and shop at the rear of the house

Side view

Inside the shop. Leak in the corner confirms that the roof needs replacing